Make the handover between stages reviewable

Construction certificate (CC) preparation introduces further document and review work after development application (DA) consent. Axiom Ready retains the reviewed DA preparation scope alongside the project’s later CC obligations.

Work from the current approved source set

  1. Bring the development consent and approved document package into the project.
  2. Review document roles, approval scope and source currency before confirming the DA package.
  3. Continue to the CC preparation workflow and inspect the current required inputs and actions.
  4. Review supporting evidence and consultant follow-ups as the preparation work progresses.

An example input and result

Example input — a current consent, approved architectural drawings and engineering documents being prepared for CC review.

Example result — the reviewed DA package is recorded, while an outstanding engineering input remains visible in CC preparation. A change to a source can require further review. Expired, superseded or withdrawn material belongs in the historical record.

Keep the approval boundary visible

Coverage by a reviewed approved DA package and verification of an individual technical requirement have different scopes. The project needs the relevant professional review and the certifier’s assessment. Axiom Ready does not issue a construction certificate.